Breakbulk Shipping
Shipping cargo that is too large, too heavy or the wrong shape for a container - loaded loose, on flat racks or on open tops.
When the Container Is the Problem
Containers are efficient precisely because everything about them is standard, which is no help at all when the cargo is not. Breakbulk means shipping the item as it is - loaded loose into the hold, or secured onto a flat rack or open top where the height or width simply will not close a door. It is a different booking, a different rate structure and a different loading plan. Part of our sea freight services.
What Ships This Way
The test is simple: if it does not fit, or fitting it would damage it, it goes breakbulk.
Shipping Something Too Big?
Almost every assumption from container shipping stops applying, which is where budgets go wrong.
Breakbulk is quoted per shipment against the dimensions, weight and the vessel's own loading plan rather than from a rate sheet.
Not every service takes breakbulk, and not every port handles it. Sailing options narrow considerably, which affects timing more than cost.
The item has to be lifted on and off, with slinging points identified in advance - see oversized and heavy cargo handling.
Cargo in a hold has to survive weeks of vessel movement. Lashing and bracing are calculated, not improvised.
A breakbulk booking assumes the item is already at the port. Moving something that will not containerise across Dubai is its own exercise in permits and route planning, and it usually takes longer than the loading does.
Flat Rack or Loose?
Not all non-containerised cargo ships the same way.
Cargo that exceeds a container in one dimension only. It keeps container handling and slots into normal services.
Genuinely large items shipped as breakbulk on a suitable vessel, with a bespoke loading and lashing plan.
Machinery cleaned, preserved and braced first - see machinery packing.
Why Cannata
A breakbulk booking without a plan for getting the item to the quay is half a service. That road leg is usually the harder half.
Cranes and heavy handling organised as part of the job rather than left with you to source.
Movement to the port on our own low-beds and flatbeds.
Project consignments often need careful classification, handled by our own customs team.
Rate Request
Give us the route and the cargo and we will come back with a rate, usually within one working day.